Decommissioning servers: how to get value from SSDs and RAM

A rack heading for retirement means bulky chassis — and, inside them, the most sought-after components on the reuse market: enterprise SSDs and ECC memory. Done well, a decommissioning project covers its own costs. Here is what has value, what does not, and how to get organised.

Updated on · Reading time: 7 min

In a retired server, the value is concentrated

Chassis, motherboards, power supplies and fans go to material recovery: a few euros per machine, at best. Most of the value sits in two families of components, both easy to extract:

  • The SSDs: enterprise SAS and U.2, NVMe, "data centre" SATA. Bought per terabyte, whether they work or not — the value is in the NAND chips, not in the state of the controller.
  • The ECC memory: DDR4/DDR5 RDIMMs and LRDIMMs, bought per piece by generation. A dual-socket server often carries 12 to 24 modules.
  • As a side note: RAID card cache modules and on-board eMMC modules, taken on the same basis as loose chips.

What a typical rack brings in

A recent-generation 2U server commonly carries 8 to 24 SSDs of 1.92 to 7.68 TB and 256 to 1,024 GB of ECC RAM. At the scale of a full rack, the terabytes quickly run into the hundreds — and the trade price list is progressive: the larger the cumulative volume of a format, the higher the price per terabyte.

Public prices per format are shown on the SAS / U.2 enterprise SSD, NVMe SSD and RAM modules pages; verified business accounts also get the volume tiers on the trade price list page.

Strip the servers yourself or send complete trays?

Pulling the SSDs out of a server takes a few minutes: hot-swap trays at the front, memory modules reachable with the lid off. Stripping the hardware yourself reduces the shipped weight and simplifies the inventory — it is the recommended route.

For large volumes where internal dismantling is not an option, describe the configuration in the quote (server models, number and capacity of the drives, amount of RAM) and attach photos: pallet collection can be arranged above 30 kg. In every case, only the memory components fetch the full price: there is no point shipping the chassis.

Keep the original caddies and trays with the SSDs: they protect the connectors in transit and make the inspection on arrival easier.

The data: deal with it before collection

Decommissioning is first of all a security matter: production racks hold customer data, backups, virtual machines. Wipe or destroy the media according to your internal policy before shipping — manufacturer commands (sanitize), cryptographic erasure for encrypted volumes, or physical destruction for the most sensitive media. Our guide details the methods: wiping an SSD before parting with it.

Media received at Recychips are dismantled in our workshop: the chips are reused as components, no drive is resold as is and no data is read. The holder's regulatory obligations (WEEE, waste register, certificate) are covered in our guide on business obligations.

Organising the batch to get paid fast

  1. Sort by format: SAS/U.2, NVMe and SATA SSDs, RAM by generation (DDR4, DDR5). The label is enough, no need to test.
  2. Count the drives and note the nominal capacities — they set the price, not working order.
  3. Create the quote online: one line per format and capacity, price calculated instantly.
  4. Pack by type in rigid boxes (anti-static bags for the RAM), with the quote reference inside the parcel. Free shipping from 20 TB (estimated).
  5. On arrival, each batch is inspected; the final offer is confirmed in your customer account, then paid by bank transfer.
FAQ

FAQ

Can't find your answer? Write to us.

Do you buy server SSDs that have failed or been securely wiped?

Yes, at the same price as working drives of the same format and capacity: the value lies in the NAND chips. An SSD that went through a sanitize erase or is locked by wear is bought normally.

Should the SSDs be taken out of their caddies?

No, you can leave them in their hot-swap trays: they protect the connectors. Just state the number and capacity of the drives in the quote.

Do you take complete servers?

The value is in the SSDs and the RAM: those are the components we buy. For a complete, unstripped fleet, describe the configuration in the quote with photos; pallet collection can be arranged for large batches.

Is ECC Registered RAM accepted?

Yes — RDIMMs and LRDIMMs are in fact especially welcome. They are bought per piece, by generation (DDR3, DDR4, DDR5), whatever the capacity.

Do you provide a certificate for our waste register?

Yes, a certificate of processing is provided to businesses on request, alongside the purchase voucher. It attests to the dismantling and reuse of the components through a compliant channel.